Sefton Council have received a proposal from the Probation Service, Northwest under the Community Rehabilitation Service department, who commission and contract manage funding available for specialist service provision to co-commission rehabilitative and resettlement activity for substance users in the borough.
It is proposed to use funding identified for Sefton to develop a Substance Misuse Navigator role within the existing current provider of Substance Use: Assessment, Treatment and Recovery Services,Change Grow Live (CGL). The Navigator role is intended to reduce offending and support better resettlement and rehabilitative outcomes for Sefton residents.
The funding is from the Ministry of Justice (MoJ) via Her Majesty’s Prison & Probation Service (HMPPS) – Probation Service Northwest. A total sum of £311,548 has been identified for Sefton. This is three-year funding running from April 2023 to March 2026, the breakdown is as follows:
23/24 |
24/25 |
25/26 |
Total |
£98,290 |
£106,403 |
£106,855 |
£311,548 |
The probation service is proposing to transfer the funding to Sefton Council under a Memorandum of Understanding which will be agreed and signed by both parties. Sefton Council will via a contract variation transfer the funding to the local provider CGL to undertake the additional responsibility to expand the service to support integrated work with probation.
The Contract Procedure Rules require the authorisation of a Cabinet Member to allocate £311,548 to the current provider of Substance Use: Assessment, Treatment and Recovery Services CGL.
There is provision for this transfer via a contract variation under Regulation 72 of the Public Contract Regulations which states:
“Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:
The proposal is for a variation modification in accordance with Reg 72 1
(b)for additional works, services or supplies by the original contractor that have become necessary and were not included in the initial procurement, where a change of contractor—
(i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the initial procurement, or
(ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority,
provided that any increase in price does not exceed 50% of the value of the original contract.
The Council was not aware of the funding at the initial procurement stage of the local service in April 2021.
The current provider CGL has in place criminal justice pathways for the intended cohort which this intervention will enhance and build upon.
There is a risk of duplication of services and costs should another provider be procured. Also, a delay in commencement and potential loss of some or all of year 1 (2023/4) funding.
The total funding does not exceed 50% of the value of the original contract.
Decision Maker: Cabinet Member - Health and Wellbeing
Decision published: 14/03/2023
Effective from: 23/03/2023
Decision:
Decision(s):
(1) The proposed contract variation to the current contract with Change, Grow, Live be approved.
(2) Authority be delegated to the Head of Health and Wellbeing / Director of Public Health to formalise the agreement to add via a contract variation an additional £311,548 to the contract with CGL for the provision of Substance Use: Assessment, Treatment and Recovery Services.
Reasons for the Decision(s):
· The allocation of £311,548 is to support reducing offending and improving rehabilitative outcomes for the local substance use population.
· The pathway will be easier and less confusing for potential beneficiaries to navigate with a single provider.
· Some beneficiaries will already have established relationships with the existing service provider.
· The proposal involves enhancing existing criminal justice interventions provided by the current service and avoids potential duplication.
· The alternative would result in delays in the commencement and a financial costs.
Alternative Options Considered and Rejected: (including any Risk Implications)
The other option would be for Probation to undertake a competitive tender process to deliver the intervention and this has been rejected due to economic and operational reasons. Also, this approach aligns with the cross-governmental drugs strategy and the introduction of the Commissioning Quality Standard, which should ensure that all relevant local stakeholders are willing and able to join in commissioning partnerships.
Wards affected: (All Wards);
Lead officer: Julie Tierney
To seek approval to the Heads of Terms for the
proposed sale of land at Foul Lane, Southport.
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Executive Director of Corporate Resources and Customer Services which sought approval to complete the disposal of land at Foul Lane (the former park and ride site) in Southport to Homes England. Following the disposal, the site will be developed out as part of a larger residential development proposal, dependent upon the award of detailed planning consent.
The report indicated that a comprehensive review of the Council’s asset base is being undertaken in phases, with assets defined as either supporting operational activity, having heritage value, being required to support the growth programme or being available for disposal. Land at Foul Lane was identified as being available for disposal to facilitate a housing redevelopment scheme in line with the site’s designation in the Local Plan. Foul Lane was therefore included in the Asset Maximisation: Phase 2 Disposals Programme presented and approved by Cabinet on 24 June 2021.
Homes England approached the Council in Autumn 2022 seeking to acquire the site at Foul Lane, Southport, as they had recently acquired the adjoining site known as Land at Crowland Street, which is also allocated for housing redevelopment in the Local Plan. Acquiring the site at Foul Lane will provide Homes England with single ownership of a site in excess of 63 acres, which will be subject to a detailed master plan and a planning application to deliver a policy compliant housing scheme.
Decision Made: That
(1) the agreed Heads of Terms for the disposal of Land at Foul Lane, Southport, as detailed within Appendix 2 of the report be approved;
(2) the deduction of up to 4% of the eventual capital receipt to cover the professional fees and incidental costs of disposal as set out in the Capital Accounting Regulations be approved; and
(3) the Chief Legal and Democratic Officer be authorised to complete the necessary legal formalities.
Reasons for the Decision:
This property transaction ensures delivery of new housing in line with the site’s allocation in the Local Plan and allows the land at Foul Lane and land at Crowland Street to be brought forward as single master plan and delivered over a number of phases.
Alternative Options Considered and Rejected:
(Option 1 – “Do nothing”: do not dispose of the site to Homes England. The Council would retain the former park and ride site.
Risk: the site would likely remain vacant and on the Council asset register. There would be ongoing holding costs liability and no capital receipt would be received.
Option 2 – “Redevelop the Foul Lane site in isolation”: the Council could look to secure outline planning consent and to dispose of the site on market to a housebuilder.
Risk: completion of land transaction would move into a later financial year and make delivery of a single, well-designed housing scheme difficult due to the need for combine sewers across sites and potential need for construction vehicular access to be provided to the Crowland Street site, which would cause disruption for residents.
Wards affected: Norwood;
Lead officer: Suzanne Rimmer
Financial updates and Policy decisions
relating to the Council’s Framework for Change 2020,
including the monthly Revenue and Capital budget monitoring
reports
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Executive Director of Corporate Resources and Customer Services which provided details of:
1) The current position relating to the 2022/23 revenue budget;
2) The current forecast on Council Tax and Business Rates collection for 2022/23; and
3) The monitoring position of the Council’s capital programme to the end of January 2023:
· The forecast expenditure to year end.
· Variations against the approved budgets and an explanation of those variations for consideration by Members.
· Updates to spending profiles and proposed amendments to capital budgets necessary to ensure the efficient delivery of capital projects are also presented for approval.
Decision Made:
Revenue Budget
(1) the current position relating to the 2022/23 revenue budget be noted;
(2) the actions being taken to offset the budget pressures being faced in 2022/23 be noted;
(3) the financial risks associated with the delivery of the 2022/23 revenue budget be recognised and it be acknowledged that the forecast outturn position will continue to be reviewed, and remedial actions put in place, to ensure a balanced forecast outturn position and financial sustainability can be achieved;
(4) the current position relating to the High Needs budget be noted and that officers are currently reviewing all options available to the Council to mitigate the additional pressure and to make the overall High Needs budget financially sustainable;
Capital Programme
(5) the spending profiles across financial years for the approved capital programme (paragraph 7.1) be noted;
(6) the latest capital expenditure position as at 31 January 2023 of £26.898m (paragraph 7.3); and the latest full year forecast of £43.493m (paragraph 7.4) be noted;
(7) it be noted that that capital resources will be managed by the Executive Director Corporate Resources and Customer Services to ensure the capital programme remains fully funded and that capital funding arrangements secure the maximum financial benefit to the Council (paragraphs 7.12-7.14);
Council Tax Support Fund
(8) the intention to auto-award up to £25 to all Local Council Tax Support scheme claimants against their Council Tax Liability for 2023/24 in line with Government guidelines be noted;
(9) approval be given to the amendment of the “Council Tax Reduction in Liability” Policy for 2023/24 to make additional discretionary awards, as described in Paragraph 8.5, to utilise the Government funding allocated to the Council;
Business Rates – Implementation of Local Discount Schemes for Retail,
Hospitality, Leisure in 2023/24
(10) approval be given to the implementation of the Business Rates Local Discount Scheme for Retail, Hospitality and Leisure in 2023/24 in line with the guidelines issued by the Government;
Business Rates – Implementation of Supporting Small Business Relief Scheme from 2023/24
(11) approval be given to the implementation of the Business Rates Supporting Small Business Relief Scheme for Retail, Hospitality and Leisure in 2023/24 in line with the guidelines issued by the Government.
Reasons for the Decision:
To ensure Cabinet are informed of the current position in relation to the 2022/23 revenue budget.
To provide an updated forecast of the outturn position with regard to the collection of Council Tax and Business Rates.
To keep members informed of the progress of the Capital Programme against the profiled budget for 2022/23 and agreed allocations for future years.
To progress any changes that are required in order to maintain a relevant and accurate budget profile necessary for effective monitoring of the Capital Programme.
To approve any updates to funding resources so that they can be applied to capital schemes in the delivery of the Council’s overall capital strategy.
Alternative Options Considered and Rejected:
None.
Wards affected: (All Wards);
Lead officer: Paul Reilly
To agree the approach for the procurement of
Liquid Fuels with effect from 22nd November 2023.
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Executive Director of Corporate Resources and Customer Services which sought approval to the proposed approach for the procurement of Liquid Fuels with effect from 22November 2023.
Decision Made: That
(1) approval be given to Sefton Council sourcing the supply of Liquid Fuels via the new Yorkshire Purchasing Organisation (YPO) Liquid Fuels supply framework to be established with effect from 22 November 2023, for a maximum period of four years to 21 November 2027. The contract will be for two years with options for two one-year extensions.
(2) the Assistant Director Corporate Resources and Customer Services (Strategic Support) be authorised in consultation with the Cabinet Member Regulatory, Compliance and Corporate Services to approve and implement the resulting supply arrangements to ensure uninterrupted service.
Reasons for the Decision:
The Council must procure quantities of liquid fuels to operate its daily business. Under the Council’s Contract Procedure Rules, the level of expenditure involved (approximately £965,300.00 per annum) requires that Pre-Procurement Approval is sought from Cabinet.
It is considered that the Council can best be assured of value for money, in terms of price and security of supply, by continued procurement through an external framework contract that is able to offer considerably more collaborative usage volume to the market than Sefton Council alone can offer.
Alternative Options Considered and Rejected:
The Council could decide not to continue procuring Liquid Fuels through an external framework and instead undertake its own procurement process. This process would need to be a procurement process compliant with the Public Contract Regulations and would take approximately six months to complete.
The significant risk in that, and the reason this option has not been recommended, is that it is considered that the separate procurement of lower volumes of fuel (i.e., Sefton Council procuring fuel alone) is certain to result in much higher unit prices, potentially greater fluctuation in price, and potentially less reliable supply, than if the Council pools its requirement with a significantly wider user group.
Wards affected: (All Wards);
Lead officer: Jan McMahon
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Executive Director of Corporate Resources and Customer Services which sought approval for a procurement exercise to be undertaken for a new Insurance Contract, to ensure the continued provision of effective insurance and to secure the most advantageous position for the Council.
Decision Made: That
(1) approval be given to a procurement exercise been undertaken for a new insurance contract, to be effective from 29 September 2023 onwards, using the YPO Dynamic Purchasing System Framework Agreement for Insurance Placement DPS - 978 to enable a new contract to be implemented for three years with two one-year extensions; and
(2) the Executive Director of Corporate Resources and Customer
Services be authorised in consultation with the Cabinet Member, Regulatory, Compliance and Corporate Services to award the contract (and any subsequent extension) to the highest scoring bidder from the procurement exercise to be undertaken in 2023/2024.
Reasons for the Decision:
The Council should tender the insurance programme to ensure that the Council obtains value for money in accordance with the Contract Procurement Rules. Use of the YPO Dynamic Purchasing System Framework Agreement DPS – 978 for Insurance Placement beyond September 2023 also offers the opportunity to access a large number of pre-vetted insurers, including any new entrants to the market.
Alternative Options Considered and Rejected:
Renewing with the existing insurance programme insurers would be in breach of the Council’s Contract Procedure Rules and would open the Council to challenge.
Council could self-insure and not insure through third parties. All claims including catastrophic claims would need to be paid for by the Council which the current financial budget is not designed to respond to. Insurance is designed to provide catastrophic cover for low likelihood but high financial impact. There are therefore not viable.
Wards affected: (All Wards);
Lead officer: David Eden
Provide an update on the embedding of Health
and Safety within the Council.
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Executive Director of Corporate Resources and Customer Services which provided details of the progress made to implement the Council’s Health and Safety policy during 2021/22.
Decision Made:
That the progress made on implementing the Council’s Corporate Health and Safety Policy during 2021/22 be noted.
Reasons for the Decision:
The annual report provides assurance to the Cabinet, which has strategic responsibility for employee health and safety, that there is continued progress to implement and enhance an effective health and safety system across the Council.
Alternative Options Considered and Rejected:
None.
Wards affected: (All Wards);
Lead officer: David Eden
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Wards affected: Norwood;
This paper provides an outline strategy for
delivering a robust business case and the associated high-level
costs. This is the first phase of reviewing the properties for
development and, subject to approval, further exercises will
commence during the next 6 months.
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
Further to Minute No 99 of the meeting held on 9 January 2020, the Cabinet considered the report of the Assistant Director of People (Communities) which provided an outline strategy for delivering a robust business case for the use of two properties for use as temporary accommodation and the associated high-level costs.
The report indicated that two properties are most suited for use as temporary accommodation, and that they can be configured into the following temporary accommodation units:
· Site 1 - 6 self-contained flats
· Site 2 - 7 self-contained flats
Across both sites this would deliver 8 x 1-bed units and 5 x 2-bed units.
This is the first phase of reviewing the properties for development and, subject to approval, further exercises will commence during the next six months.
Decision Made: That
(1) approval be given to the progression of a robust business case for this invest to save proposal and for officers to develop the implementation plan, subject to the completion of surveys;
(2) approval be given to the development of the financial plan which will include financing the project through one, or a mix, of the following capital funding options:
a) Grant funding
b) Borrowing; and
(3) it be noted that progress updates will be provided to Cabinet in Summer 2023.
Reasons for the Recommendations:
(i) The project will reduce significant revenue costs in order to use those funds upstream on homeless prevention activities. Increases in homeless prevention will improve outcomes for households in Sefton by preventing evictions and homelessness.
(ii) Increasing the portfolio of emergency temporary accommodation reduces the need to use nightly rate accommodation (e.g., hotels) which is subject to market demand. At times of high demand for this type of accommodation in Sefton, homeless households may need to be placed out of borough and at higher cost.
(iii) Both properties are currently out of use and the condition is poor and in need of development.
Alternative Options Considered and Rejected:
1. Sell the assets on the open market.
Independent valuations (February 2022) of the sites reported that the following capital receipts could be achieved, were the properties to be sold for the conversion of the properties to residential uses:
Site 1 £110,000
Site 2 £225,000
Risk: The impact is threefold.
Firstly, there would be the loss of potential accommodation for the most vulnerable in the community as the properties would likely be developed privately and yield unaffordable rents or sold on for profit.
Secondly, with the current cost of living increases it is highly likely that more households would have difficulty covering their accommodation costs leading to more evictions and increased homelessness. If savings on temporary accommodation are not realised, less prevention activity will be delivered.
Finally, temporary accommodation (e.g., hotels or other nightly rate accommodation) is currently funded through grants from the Department for Levelling Up, Housing and Communities (the Homelessness Prevention Grant). If this grant was to reduce in future years, the cost of providing temporary accommodation to statutory homeless households would fall on the local authority.
2. Purchase similar sized accommodation across Sefton to use as temporary accommodation.
Properties on the open market (December 2022) of similar size and location to the units in this proposal are priced at between £100,000-£130,000 per unit. Based on purchasing 13 units the cost of this option could range between £1.3m-£1.69m.
Risk: The above figure is solely based on purchase price alone and many of the properties will need additional refurbishment work carried out to bring them up to standard. Acquiring this volume of properties could take much longer.
Wards affected: (All Wards);
Lead officer: Allan Glennon
To seek an extension of the Park & Ride
Bus Contract
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Assistant Director of Place (Highways and Public Protection) which sought approval for a six-month extension to the contract for the provision of the bus service for the Park and Ride operation in Southport and authority to procure a new contract for the operation of the Park and Ride bus service from the expiry date of the extended contract.
Decision Made: That
(1) the Assistant Director of Place (Highways and Public Protection) be authorised to enter into a six-month extension to the contract for the provision of the bus service for the Park and Ride operation in Southport;
(2) the Assistant Director of Place (Highways and Public Protection) be authorised to commence the procurement of a new contract to operate the Park and Ride bus service from the expiry date of the above extended contract; and
(3) the Assistant Director of Place (Highways and Public Protection) be authorised in consultation with the Cabinet Member Regulatory, Compliance and Corporate Services, to award a contract for a period of five years to the highest scoring Tenderer in the above procurement process.
Reasons for the Decision:
To ensure continued provision of the service until the tender exercise can be completed and to secure a new contract once that exercise is completed.
Alternative Options Considered and Rejected:
Consideration was given to not extending the contract. This was rejected as this is not considered to be the best value option for the Council, for the reasons set out in the report.
Wards affected: (All Wards);
Lead officer: Dave Marrin
To seek authorisation to tender the Parking
& Environmental Enforcement Contract
Decision Maker: Cabinet
Made at meeting: 09/03/2023 - Cabinet
Decision published: 14/03/2023
Effective from: 09/03/2023
Decision:
The Cabinet considered the report of the Assistant Director of Place (Highways and Public Protection) which sought approval to invite tenders through the appropriate procurement route for the provision of a parking and environmental enforcement, cash collection and car park management service.
Decision Made: That
(1) approval be given to the tender process to procure the provision of a parking and environmental enforcement service as outlined in the report;
(2) the contract be for period of five years from 1 October 2023; and
(3) the Assistant Director of Place (Highways and Public Protection) be authorised in consultation with the Cabinet Member Regulatory, Compliance and Corporate Services, to award a contract to the highest scoring Tenderer in the above procurement process.
Reasons for the Decision:
To ensure continued provision of a statutory service.
Alternative Options Considered and Rejected:
No other options have been considered.
Wards affected: (All Wards);
Lead officer: Dave Marrin
To seek approval for the progression of a Traffic Regulation Order, the effect of which will introduce a 20mph speed limit on a new road off Spencer’s Lane, Melling.
Decision Maker: Cabinet Member - Locality Services - Deputy Leader
Decision published: 09/03/2023
Effective from: 18/03/2023
Decision:
Decision(s):
(1) the implementation of a Traffic Regulation Order be approved, the effect of which will introduce a 20mph speed limit on Pye Bridge Close, Melling;
(2) the necessary legal procedures, including those of public consultation and advertising the Council’s intention to implement the Order, be approved;
(3) in the event that no objections are received during the consultation process referred to in (2) above, the Chief Legal & Democratic Officer be authorised to make the Order and the Highway Management Manager be authorised to implement the Order; and in the event that objections are received during the consultation process, the matter be referred to Licensing & Regulatory Committee for consideration in accordance with the Council’s Constitution.
Reasons for the Decision(s):
The Council has the power to revoke a Traffic Regulation Order (Part IV of Schedule 9 to the Road Traffic Regulation Act 1984) as well as the power to make a new Traffic Regulation Order (Section 1 of that Act). Authorisation to advertise new Traffic Regulation Orders falls under the remit of Cabinet Member Locality Services.
Alternative Options Considered and Rejected: (including any Risk Implications)
None
Wards affected: Molyneux;
Lead officer: Steve Johnston
To seek approval for the progression of a Traffic Regulation Order, the effect of which will create a ‘Police Only’ parking bay on Coastal Road, Ainsdale.
Decision Maker: Cabinet Member - Locality Services - Deputy Leader
Decision published: 09/03/2023
Effective from: 18/03/2023
Decision:
Decision(s):
(1) the implementation of a Traffic Regulation Order be approved, the effect of which will introduce a ‘Police Only’ parking bay on the north-east side of Coastal Road, from a point 255 metres south-east of the projected southerly kerb line of Pinfold Lane, to a point 275 metres south-east of the projected southerly kerb line of Pinfold Lane;
(2) the necessary legal procedures, including those of public consultation and advertising the Council’s intention to implement the Order, be approved;
(3) in the event that no objections are received during the consultation process referred to in (2) above, the Chief Legal & Democratic Officer be authorised to make the Order and the Highway Management Manager be authorised to implement the Order; and in the event that objections are received during the consultation process, the matter be referred to Licensing & Regulatory Committee for consideration in accordance with the Council’s Constitution.
Reasons for the Decision(s):
The Council has the power to revoke a Traffic Regulation Order (Part IV of Schedule 9 to the Road Traffic Regulation Act 1984) as well as the power to make a new Traffic Regulation Order (Section 1 of that Act). Authorisation to advertise new Traffic Regulation Orders falls under the remit of Cabinet Member Locality Services.
Alternative Options Considered and Rejected: (including any Risk Implications)
None
Wards affected: Ainsdale;
Lead officer: Steve Johnston
To seek approval for the temporary closure of Hoggs Hill Lane (Altcar Footpath No.5) Public Right of Way, Little Altcar/Formby (between St Lukes Church Road and Altcar footpath number 6) to facilitate its upgrade from natural surface track to a 3m wide stone path with timber edges.
Decision Maker: Cabinet Member - Locality Services - Deputy Leader
Decision published: 09/03/2023
Effective from: 18/03/2023
Decision:
Decision(s):
(1) The temporary closure of Hoggs Hill Lane (Altcar Footpath No.5) Public Right of Way, Little Altcar/Formby (between St Lukes Church Road and Altcar footpath no. 6) be approved
(2) the necessary legal procedures, including those of public consultation and advertising the Council’s intention to implement the Order, be approved;
Reasons for the Decision(s):
The Council has the power to make temporary Traffic Regulation Orders under (Section 14 of the Road Traffic Regulation Act 1984).
Alternative Options Considered and Rejected:
The site is bounded to the south by Altcar Training Camp and to the north by a ditch / farm fields and as such adequate space to provide parallel pedestrian routes are not viable during the construction phase. A closure is therefore required in order to carry out the works in a safe manner.
Wards affected: Harington; Ravenmeols;
Lead officer: Brian Goodwin
To seek approval for the progression of a Traffic Regulation Order, the effect of which will prohibit waiting on Bridle Way, Netherton.
Decision Maker: Cabinet Member - Locality Services - Deputy Leader
Decision published: 09/03/2023
Effective from: 18/03/2023
Decision:
Decision(s):
(1) the implementation of a Traffic Regulation Order be approved, the effect of which will prohibit waiting on the south-east side of Bridle Way, from a point 130 metres south-west of the south-westerly kerbline of Bridle Way (north-eastern leg) projected to a point 74 metres south-west of the south-westerly kerbline of Bridle Way (north-eastern leg) projected;
(2) the necessary legal procedures, including those of public consultation and advertising the Council’s intention to implement the Order, be approved;
(3) in the event that no objections are received during the consultation process referred to in (2) above, the Chief Legal & Democratic Officer be authorised to make the Order and the Highway Management Manager be authorised to implement the Order; and in the event that objections are received during the consultation process, the matter be referred to Licensing & Regulatory Committee for consideration in accordance with the Council’s Constitution.
Reasons for the Decision(s):
The Council has the power to revoke a Traffic Regulation Order (Part IV of Schedule 9 to the Road Traffic Regulation Act 1984) as well as the power to make a new Traffic Regulation Order (Section 1 of that Act). Authorisation to advertise new Traffic Regulation Orders falls under the remit of Cabinet Member Locality Services.
Alternative Options Considered and Rejected: (including any Risk Implications)
None
Wards affected: Netherton and Orrell;
Lead officer: Steve Johnston
To seek approval for the award of £523,181 of the 3-year Rough Sleeper Initiative (RSI) 2022/25 ring-fenced grant funding to Merseycare for the provision of a dedicated Psychologist Service for Sefton’s Homeless Services, from Cabinet Member.
Decision Maker: Cabinet Member - Communities and Housing
Decision published: 08/03/2023
Effective from: 17/03/2023
Decision:
Decision(s): |
(1) £523,181 of Rough Sleeper Initiative 2022/25 ring-fenced funding from the Department of Levelling Up, Housing & Communities be approved, to Merseycare for the provision of a dedicated Psychologist Service for Sefton’s homeless services, as follows: · 2022/23 - £137,611 · 2023/24 - £190,123 · 2024/25 - £195,447
|
|
Reasons for the Decision(s):
Alternative Options Considered and Rejected: (including any Risk Implications)
The Council could choose to refuse acceptance of the grant funding, however, would be unable to deliver the proposed homeless services.
Wards affected: (All Wards);
Lead officer: Graham Parry
This report seeks approval of the 2022 Gypsy and Traveller Accommodation Needs Assessment (GTANA), prepared for the Council by specialist consultants Opinion Research Services. The existing GTANA dates from 2014. The 2022 GTANA would be up-to-date evidence to inform the development management process and any future review of the Sefton Local Plan.
Decision Maker: Cabinet Member - Planning and Building Control
Decision published: 08/03/2023
Effective from: 17/03/2023
Decision:
Decision(s):
That 2022 Gypsy and Traveller Accommodation Needs Assessment (GTANA) be approved as evidence to inform the planning process.
Reasons for the Decision(s):
To allow the Council to publish the 2022 Gypsy and Traveller Accommodation Needs Assessment (GTANA), to provide an up-to-date evidence base. The GTANA has been prepared in line with the requirements of the Government’s Planning Policy for Traveller sites (2015) and the National Planning Policy Framework (2021).
Alternative Options Considered and Rejected: (including any Risk Implications)
Not to approve this document and to rely on the 2014 GTANA, which independent Planning Inspectors have already found to be out of date in appeal decisions.
Wards affected: (All Wards);
Lead officer: Andrea O'Connor
Green Sefton fees and charges for 2023/24 are set out in the report and are proposed to adoption and enactment from 1st April 2023.
Decision Maker: Cabinet Member - Health and Wellbeing
Decision published: 08/03/2023
Effective from: 17/03/2023
Decision:
Wards affected: (All Wards);
Lead officer: Mark Shaw